Views: 0 Author: Site Editor Publish Time: 2026-05-12 Origin: Site
In 2026, King Machine Company delivered a turnkey water filling line to SmartUp factory in Kumasi, Ghana. The project includes a complete water combi line designed for high efficiency, reliability, and compliance with local regulations.
At the core of the system is a high-performance blowing filling capping machine, enabling fully integrated production from preform to finished bottled water.
One of the key highlights of this water filling line is the integration of a tax stamp labeling machine. In Ghana, tax stamps are essential for bottled water products to be legally sold in the market.
King Machine designed the water combi line to include automatic tax stamp application, ensuring that every bottle produced by the water filling machine meets regulatory requirements without slowing down production speed.
The entire water filling line was installed, tested, and commissioned within one month. By April 2026, the water filling machine was running at full capacity.
The first batch of bottled water received excellent feedback during a family event, demonstrating both product quality and system reliability.
With stable operation and continuous output, this water combi line supports SmartUp’s expansion in the competitive bottled water market in Ghana.
King Machine will continue to deliver advanced water filling line and water filling machine solutions, helping global clients succeed in diverse regulatory environments.